What should be noted for winter maintenance of environmentally friendly large-scale brick machine equipment?


When the temperature is too low, especially in the Northeast region. After the production line is shut down, the following aspects should be done as soon as possible.

1) All hydraulic oil in the hydraulic pump station must be drained.

2) The PLC control cabinet should be placed indoors to prevent low-temperature water vapor from freezing and melting, which could cause a short circuit in the circuit.

3) If rubber hydraulic hoses are used, they should be removed in a timely manner and placed indoors. Preventing freezing and thawing can reduce the lifespan of the hose and cause oil leakage.

4) For users who continue to produce in areas with weather below 0 ℃, please drain the water from your radiator to prevent freezing damage. If the temperature exceeds -15 ℃, please remove your radiator and place it indoors. If the weather is too cold, even if the water inside is drained, it will freeze damage. Also, replace the oil inside the vibration box with oil below size 30 to reduce the viscosity of the oil. First, clean the vibration box with diesel, then replace it with No. 30 engine oil to avoid slow machine vibration, slow starting, and easy motor burning

5) Always turn on the cement brick machine after it has completely thawed to avoid unnecessary losses caused by freezing.


Tiktok Video Number